Sandwich panels: 3520 m², Claddding with backind system: 1350 m², Glazing 500 m²
The project involved the supply and installation of the complete building envelope, as well as selected internal wall systems. Particular emphasis was placed on detailed engineering and design coordination, ensuring proper connections between the various building systems through carefully developed interface details.